Application Process

Let's do business

At T-Mobile, we know what goes into building a robust wireless network, so we understand your needs! Our team has the experience and the know-how to help you deliver.

Application Easy As 1-2-3

1 Application Info

This is the place to start. The online submission form is easy to fill out

2 Select a Site

When you have found the site you would like to apply for, click 'Apply' to continue the application.

3 Equipment Options

Finalize your application by detailing out the equipment that you will be working with.

Get Started

New User? Create Account first

Post Application What you can expect from us

DAY12

First Contact

We respond with preliminary application approval, and include our site data package

DAY30

Site Walkthrough

Preliminary site walk takes place along with designing initial site installation

DAY60-90

Lease Drafted

We send executable lease documents to you for signature

DAY90-120

Begin Project

Notice to Proceed is issued, and your build can commence

Download Forms

Should you require a T-Mobile USA Inc. W9 document for your fee check request, you may download it here:

Download T-Mobile W9Download W9 Fee Instructions

Construction Standards: The T-Mobile Colocation Master Construction Standards are intended to govern any on-site construction activities by all tenants and their contractors/subcontractors.

Download Construction Standards June

A & E Standards: The T-Mobile Colocation Architectural and Engineering/Structural Analysis Standards are intended to govern any site development and design documentation required for site construction design approval. These are minimum requirements for site development documentation review and application approval.

Download A & E Standards v3.0

Fees

Application Fee: $1,000.00

Structural Analysis

Type of Structure Fee *
Monopole (for standard analysis) $1,800.00
Self-support structure $2,500.00
Other Structure (eg. camouflaged sites) Please call us for a quote
Tower Modification Drawings Please call us for a quote

(these are not included in the structural analysis fee)

Intermods / MPE Fees

Type of Structure Fee *
Inter-modulation Study $1,700.00
Maximum Permissible Exposure Study $1,700.00
Post-construction Fee ** $2,500.00

* Fees depend on the type of structure.

** Here’s some good news: this fee is waived with timely submission of site close-out documents.

Please note: The above fees are subject to change at any time. They are also subject to any Master License Agreement between T-Mobile and the applicant company.